Ganttly Project Timeline MCP Server for Claude

By Zovo

Overview

Ganttly Project Timeline builds a project schedule and Gantt chart from a task list using the critical path method (CPM). It is used by project managers, team leads, consultants, and students planning a thesis. List tasks with durations, dependencies, and a start date. Ganttly returns early start, early finish, late start, late finish, and total float for each task, the critical path, milestones, and the project end date. Calendars: plan on business days that skip weekends and the public holidays of a chosen country (with regional holidays, local weekends such as Friday-Saturday, and your own days off such as a year-end shutdown), or on plain calendar days. Durations can be given in days or weeks. Dependencies are finish-to-start and can carry a lag ("Design+2") or a lead ("Build-3"). Tasks can have a start-no-earlier-than date, an owner, or be zero-length milestones. The interactive chart has a day and week axis, task bars, dependency arrows, the critical path in red, float after each bar, milestone diamonds, and a today line. Tap a task for its dates and float, and test a slip to see the new end date and critical path. What-if analysis compares up to four scenarios against the plan, for example how far a 5-day slip moves the finish and which tasks become critical. Downloads: a CSV schedule, an .ics calendar file with milestones and task start dates, and an SVG image of the chart for slides and documents. The schedule is computed by deterministic code, so the same inputs give the same dates. Dependency loops and unknown task names are explained in plain language. Example: "Make a Gantt chart starting 2026-11-02: Design 5 days; Build 10 days after Design; Test 4 days after Build; Docs 3 days after Design; Launch milestone after Test and Docs." Limitations: finish-to-start links only (no start-to-start or finish-to-finish), whole-day scheduling, and no resource levelling, costs, or progress tracking. Plans are not saved or synced with project tools.

How to connect

  1. Claude: Open the Ganttly Project Timeline listing in the Claude connectors directory and choose Connect. Claude listing Ganttly Project Timeline exposes 2 tools here.

Tools

compare_timeline_scenarios

Claude
Use this when the user asks what happens to a project schedule if a task slips, takes longer or shorter, or starts later: for example "if Design slips 5 days, when do we finish?" or "does the critical path change?". Takes the same task list and calendar as plan_project_timeline plus 1 to 4 scenarios, each with changes (extra_days, a new duration, or a new start-no-earlier-than date). Returns the baseline and each scenario's end date, the delay in working and calendar days, the new critical path, tasks that became or stopped being critical, and how much of each slip was absorbed by float. Does not change or save the plan. Do not use for the first schedule of a project (use plan_project_timeline).

plan_project_timeline

Claude
Use this when the user wants a Gantt chart, project timeline, project schedule or project plan with milestones from a task list, wants to find the critical path and project duration, or asks for early start, early finish, late start, late finish, total float or free float (critical path method). Takes tasks with durations (days or weeks), finish-to-start dependencies with optional lags, optional start-no-earlier-than dates, owners and milestones, plus a start date and a business-day calendar with country public holidays or calendar days. Returns every task's dates and float, the critical path, milestones and the end date, an interactive Gantt chart, and CSV, .ics and SVG downloads. Detects dependency loops and unknown task names. Does not save projects, sync with project tools, track progress, or level resources. Do not use for a single date difference or for daily to-do planning.

Similar Apps

Listed on MCP App Store

Listed on MCP App Store

Add this badge to your site or README. It links to this page.

HTML

<a href="https://mcp-app-store.keenethics-labs.com/app/ganttly-project-timeline"><img src="https://mcp-app-store.keenethics-labs.com/badges/listed-on-mcp-app-store.svg" alt="Listed on MCP App Store" width="220" height="44"></a>

Markdown

[![Listed on MCP App Store](https://mcp-app-store.keenethics-labs.com/badges/listed-on-mcp-app-store.svg)](https://mcp-app-store.keenethics-labs.com/app/ganttly-project-timeline)