compare_bill_to_quote
ClaudeCompares a builder's or subcontractor's quote, line by line, with the user's OWN estimate for that project: each quote line is matched to the closest item of the same unit in the estimate and marked below / in line / above (in line = 20% below to 25% above the estimate's rate). Lines without a match, and lump sums, are listed, not guessed. Read-only. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).
estimate_from_brief
ClaudeMakes a new early-stage cost estimate (a priced bill of quantities by Estie, GetEstimatED's estimator) from a written brief — no drawings needed — in a new project in the user's own account. TWO STEPS: the first call changes nothing and returns a preview (what will be priced, province, quality class, and the PRICE in rand — up to about R X, which is also the most they can be charged — against their wallet balance; Pro accounts are unlimited and are not charged from a wallet) plus a confirm_token; only after the user agrees, call again with exactly the same arguments plus confirm_token (valid 10 minutes, single use). The estimate takes a few minutes: the second call returns the project_id — then call get_my_bill to fetch the totals and the PDF / Excel links. The user pays only what the estimate actually costs, at least R15, never more than the price shown; a failed run costs nothing. If the wallet is below the price, nothing runs and top_up_wallet adds money (R100, R250, R500 or R1 000). Very large jobs are refused: split them per building or ask GetEstimatED for a quote. Provinces: GP, WC, KZN, EC, FS, LP, MP, NW, NC (or the province name). Quality classes: economic, standard, middle, luxury, exclusive, super_luxury. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).
get_my_bill
ClaudeReturns one of the user's own estimates (bill of quantities made by Estie): totals excl./incl. VAT with the likely range, contingency, the value per trade, how much of it is priced, and links to download the PDF and Excel (valid 24 hours). If the estimate is still being made it says so — ask again in a minute. Read-only. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).
list_my_projects
ClaudeLists the projects in the user's own GetEstimatED account with each project's latest estimate (status, total incl. VAT when ready) and the wallet balance in rand. Use it first to find a project_id. Read-only. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).
sa_building_rate_lookup
ClaudeApproximate all-in South African building rate for an item of work (materials + labour + plant + contractor margin, excl. VAT) per unit, e.g. "230 mm brick wall" per m², "concrete strip footing" per m³, "IBR roof sheeting" per m², "ceramic floor tiles" per m². Adjusted for the province and, for finish items, the quality class. From GetEstimatED's own rate guide 2026 — a guide for budgeting, not a quotation.
sa_check_quote
ClaudeChecks the line rates in a South African building or repair quote against GetEstimatED's rate guide: each recognised line is marked below, in or above the usual range for the province and quality class, with the guide rate, and the recognised lines are totalled. Useful to homeowners, architects, brokers and assessors before accepting a quote. Lines it cannot recognise are listed, not guessed.
sa_material_price_index
ClaudeIndicative South African retail price of a building material (cement, bricks, sand, timber, roof sheeting, ceiling board, paint, tiles, sanitaryware …): the median price per unit incl. VAT, the month and how many products it is based on — for one province, or for all nine provinces side by side (province "all"). An industry pricing indicator, not a quote from a supplier.
sa_quick_estimate
ClaudeBallpark cost to build a house (or an addition) in South Africa from its floor area: low, expected and high in rand, excl. and incl. VAT, from the published rate per m² for the quality class (AECOM Africa Property & Construction Cost Guide 2025/26, private dwelling houses) adjusted for the province. Excludes site works, professional fees, municipal fees and escalation. A first budget figure — a bill of quantities priced for the actual plans is needed for a reliable price.
top_up_wallet
ClaudeAdds money to the user's GetEstimatED pay-as-you-go wallet: topup_100 = R100, topup_250 = R250, topup_500 = R500, topup_1000 = R1 000 (VAT included, South African rand). TWO STEPS: the first call returns the amount and the balance after paying plus a confirm_token; after the user agrees, the second call (same arguments + confirm_token) returns a secure Paystack payment link for the user to open and pay. The wallet is credited as soon as Paystack confirms the payment, and a tax invoice is emailed. GetEstimatED Pro accounts do not need a wallet (unlimited). Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).
wallet_balance
ClaudeShows the user's pay-as-you-go wallet: the balance in rand and the last top-ups and estimates (rand amounts only). Pro accounts are unlimited and have no wallet. Read-only. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).